![Mercia Garden Products 0628RANE0504FGDD2TW1SW-V1 Instructions Manual Download Page 16](http://html1.mh-extra.com/html/mercia-garden-products/0628rane0504fgdd2tw1sw-v1/0628rane0504fgdd2tw1sw-v1_instructions-manual_1772578016.webp)
P 16
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
Please retain product label and instructions for future reference
IMPORTANT :
Pre-drill before fixing screws.
Step 33
Parts Needed: No. 11 QTY 3
No. 21 QTY 1
Attach the Rain Guards
(No. 11)
to the
Window frame, fixing in place onto
the framing above the window using
3x70mm screws per guard.
Attach the Rain Guard
(No. 21)
to the
Door frame, fixing in place onto the
framing above the Door using
3x70mm screws.
12x70mm Screws.
70mm
screw
Pre drill
hole
11
11
11
11
21
Step 34
Parts needed - No. 41 QTY 4
No. 42 QTY 4
Align the shorter Fascia’s
(
No. 41)
with the sides of the
roof and fix using 4x40mm
screws per fascia. Do the
same with the longer Fascia’s
(No. 42)
to the front and back
of the roof. Ensure to screw
through the fascia into the
roof purlins and eaves frame.
*Ensure the angled cuts
meet at the top of the apex.
32x40mm Screws
Pre drill
hole
40mm
screw
41
42
42
41
41
42
42
41
IMPORTANT:
Pre-drill before fixing screws.