![Mercia Garden Products 0628RANE0504FGDD2TW1SW-V1 Instructions Manual Download Page 15](http://html1.mh-extra.com/html/mercia-garden-products/0628rane0504fgdd2tw1sw-v1/0628rane0504fgdd2tw1sw-v1_instructions-manual_1772578015.webp)
P 15
Please retain product label and instructions for future reference
HANDLE
WITH CARE
1
2
3
4
1.
2.
3.
4.
5.
Felt
tacks
Step 31
Parts needed - No. 46
Cut the felt
(No. 46)
into five strips &
lay onto the roof in the order shown
in the illustration.
*Ensure there is approximately
50mm of overhanging felt each
side.
Once the felt is laid out fix to the
roof using felt tacks at 100mm
intervals.
*Felt size: 5140mm
420x Felt Tacks
46
46
Pre drill
hole
70mm
bolt
44
44
Step 32
Parts needed - No. 44 QTY 8
Arrange the storm braces (
No. 44
) around
the building (
internally
). Place 2x storm
braces per side fixing into place using 2x
70mm bolts per brace making sure the
washer & nut are tightened from the
outside of the building.
*Ensure the storm braces are secured at
the highest point possible on each side.
The storm braces will need to be altered
during the buildings life as the moisture
content within the log boards changes.
The boards will expand during periods of
high moisture (Winter) and shrink during
periods of low moisture (Summer.)
**Storm braces will help your building
expand and contract properly.
***It is important that each bolt is
tightened using a washer so as not to
damage the log boards.
16x70mm Bolt Sets