D39374 | Date 08/2018
25
Putting into operation
4.
Putting into operation
NOTICE
►
When putting the appliance into operation for the first time, do not leave it unat-
tended until it has reached a steady state.
4.1
Connecting the appliance
4.1.1 Connection to the electrical supply
WARNING
Condensation in the electrical components may cause short circuits.
After transporting or storing the device under humid conditions, re-
move it from its packaging and let it ventilate for at least 24 hours in
normal environmental conditions. Do not connect the device to the
mains power during this time.
Caution:
Observe the country-specific regulations when making connections (e.g. DIN VDE
0100 with earth leakage circuit breaker, in Germany). Observe the connection and
power ratings (see nameplate and "Technical Data" on page 16). Make sure to
establish a safe PE conductor connection.
Place the power cable so that
►
it is easily accessible at all times and can be pulled off quickly, for example in case of
interference or an emergency;
►
it does not represent a trip hazard;
►
it cannot come into contact with any hot parts.
Plug the provided power cable into the rear of the appliance
and connect it to a CEE 7/4 socket. (Fig. 17).
Fig. 17
Network connec-
tion
Summary of Contents for VO Series
Page 67: ......