Installation manual
M-WRG-II M-U
2
- 22 -
Meltem Wärmerückgewinnung GmbH & Co. KG
Am Hartholz 4 · D-82239 Alling
[email protected] · www.meltem.com
VENTILATION THE RIGHT WAY
V E N T I L A T I O N & H E A T R E C O V E R Y
Fig. 12:
Vertical flat ductwork layout example,
dimensions in millimetres
120
210
104 104
228
228
Fig. 13:
Horizontal flat ductwork layout example,
dimensions in millimetres
104
104
210
228
228
125
NOTICE
In the arrangement of extract air and supply air openings shown in Fig. 12,
only use
louvred grilles
in the openings. The louvres should point towards the ceiling to avoid
an air short circuit.
8.3.2
Chasing out channels for connecting flat ductwork (multi-room version)
►
Use the wall chaser to chase out
two channels 125 mm wide, 85 mm
deep and at least 210 mm high
(see
Fig. 14)for both the extract air duct
(item 1 in Fig. 14) and the supply air
duct (item 2 in Fig. 14).
► PCheck that the installation kit fits
easily into the wall breakthrough.
►
Check that the installation kit can
be pushed far enough into the wall
breakthrough for the front surface to
end flush against the solid wall; the
plastering trim must protrude 15 mm
beyond the solid wall.
►
If necessary, use the wall chaser to
chase out channels for the rest of the
flat ductwork as shown in your plans.
Fig. 14 shows an example with the flat ductwork running vertically and horizontally.
Fig. 14: Chasing out channels for ductwork connection
with flat ductwork, dimensions in millimetres
104
104
210
228
228
125
1
2