Installation manual
M-WRG-II M-U
2
- 20 -
Meltem Wärmerückgewinnung GmbH & Co. KG
Am Hartholz 4 · D-82239 Alling
[email protected] · www.meltem.com
VENTILATION THE RIGHT WAY
V E N T I L A T I O N & H E A T R E C O V E R Y
8.2
Breaking through the wall
The wall breakthrough can either be included when planning a new build or subsequently
made in the solid wall.
Fig. 9: Wall breakthrough for installation kit
without
filler piece, dimensions in
millimetres
456
680
min. 300
min. 50
273
420
456
680
min. 300
min. 50
Fig. 10: Wall breakthrough for installation kit
with
filler piece, dimensions in millimetres
8.2.1 Planning the wall breakthrough for new builds
►
Commission an architect or design professional to include the wall breakthrough at
a suitable point in the construction drawing and execute it when constructing the
building shell.
There are two possible versions of the wall breakthrough:
—
Wall breakthrough with recess (see Fig. 9) for installation kit
without
filler piece
M-WRG-II M/Fü
—
Complete wall breakthrough (see Fig. 10) for installation kit
with
filler piece
M-WRG-II M/Fü
8.2.2 Breaking through an existing wall
WARNING
Danger due to damaging supply lines and changing the stress loadings
► Make sure that there are no supply lines in the vicinity of the wall breakthrough (e.g.
power, gas or water).
► Make sure that the wall breakthrough does not affect the local static loading require
-
ments.
►
Fit a lintel if necessary.