Adjustment of the machines effected by author-
ised service technician during the first setting in
operation
8.1
Commissioning
Commissioning and training will be handled and provided by MEIKO authorised ser-
vice technician. The operator must not use the installation before completing training.
Perform any required initial checks on supplied parts, such as water treatment units
or other units. More detailed information, if required, can be found in the relevant
operating instructions.
To avoid damage or dangerous injuries during the setting in operation of the instal-
lation, please observe the following points:
WARNING
Risk of injury, damage to property!
As a result of unintended work on the system.
All persons involved in operation, maintenance or repair work must have read and
understood the
General safety instructions
section.
DANGER
Risk of fatal electrical shock or fatal injuries caused by rotating parts!
All cladding must be intact before commissioning!
Check any escaped fluids have been removed.
Activate all the safety systems before commissioning.
Check that all screw connections are tight.
8.2
Chemical product settings
The correct settings for the quantity of detergent and rinse aid depend on the product
used. The relevant chemical product supplier can install the correct setting.
8.3
Work prior to initial commissioning
It is paramount to comply with the instructions in this section prior to initial commis-
sioning.
Water carrying pipes
All pipes must be thoroughly flushed. In this process, the heating must be switched
off (remove the fuses) to avoid dry-heating of the heating elements. Subsequently
clean all dirt traps.
Steam pipes
All lines must be thoroughly flushed. In this process, all valves must be open and all
condensation traps must have been removed. Subsequently clean all dirt traps.