
46 / 54
9018116
Maintenance work
Visual check
Che
c
k
e
d
Cle
a
ne
d
Rec
on
di
tio
ne
d
Mainte-
nance re-
quirement
7.
Disinfectant and detergent dosing
Replace peristaltic tube and seals on the nozzles
Annually
Check the detergent/disinfectant dosing system is working and not leaking
Annually
8.
Rinse aid dosing
Replace peristaltic tube and seals on the nozzles
Annually
Check the rinse aid dosing system is working and not leaking
Annually
9.
Compressed air connection
Check the hose couplings! Replace them if damaged.
Annually
10.
Test run with a function test on the whole machine
Check filling and heating until it is ready for operation
Annually
Visual inspection of the entire machine for leaks
Annually
Check sample rinsing and rinsing results
Annually
Brief training for new personnel
Annually
11.
Options
Integrated reverse osmosis system (if available)
Visually check whole system for leaks
Annually
Replace pre-filter
Every six
months
Check fine sieve insert and choke in concentrate pipeline
Annually
Check correct function of concentrate drain and check for deposits
Annually
Fill in separate log, "Certificate of Commissioning GiO"
Annually
Partial demineralisation (PD) / Full demineralisation (FD) (if available)
Functional test
Annually
12.
Water quality, temperature
Drinking water
°C
°dH
°KH
µS/cm
Annually
Water quality after water treatment (if availa-
ble)
°C
°dH
µS/cm
Annually
13.
Electrical safety check (certificate is optional)
Perform visual check
Annually
Check earth wire
Annually
Insulation resistance measurement
Annually
Measure current on protective earth conductor
Annually
Summary of Contents for TopClean M
Page 53: ...9018116 53 54 15 Notes...