Unit Maintenance
MPQ2000-UG-EN Rev 8 October 2018
85
5.
Carefully lift on the front panel handle to lift the front panel from its enclosure,
as shown below. (Do not pass 90 degrees. If so, the current PCB ribbon cable
will disconnect.)
6.
Remove the 3 screws holding the battery cover in place.
7.
Remove the battery cover.
8.
Grasp the wires between the battery and the connector and pull straight up until
the connector unplugs from the MPQ2000.
9.
Connect a new battery to the MPQ2000 by aligning the battery connector to the
pins and pressing it in place.
10.
Place the battery in the battery compartment with the wires under it.
Summary of Contents for PQ2000
Page 2: ......
Page 3: ...MPQ2000 PQ Analyzer...
Page 8: ...M MPQ2000 UG EN Rev 8 October 2018 2 M...
Page 10: ...M MPQ2000 UG EN Rev 8 October 2018 4 M...
Page 18: ...M MPQ2000 UG EN Rev 8 October 2018 12 M...
Page 22: ...MPQ2000 UG EN Rev 8 October 2018 16 M...
Page 27: ...MPQ2000 Operation MPQ2000 UG EN Rev 8 October 2018 21 Menu Flow Charts DMM Screen...
Page 28: ...M MPQ2000 UG EN Rev 8 October 2018 22 DMM Mode...
Page 48: ...M MPQ2000 UG EN Rev 8 October 2018 42 M...