Installing the MPQ2000 PQ Analyzer
MPQ2000-UG-EN Rev 8 October 2018
41
(110V-240VAC 50Hz/60Hz). The AUX / Va Power Switch must be set to AUX to
power the unit off of the Phase A voltage.
NOTE:
If Phase A is connected to a voltage in excess of 600V AC/DC and the
AUX / Va power switch is set to Va then damage may occur to the
MPQ2000 power supply PCB.
Voltage and Current Connections
If you will not be recording demand parameters, voltage and current can be
connected to any input. The connections do not have to be in pairs, but the voltage
channels and current channels must be sequenced.
NOTE:
Current probes not purchased from Megger require Megger adapters.
To install the Power Analyzer using current clamps, plug the selected clamps into the
current input connectors (labeled IA, IB, IC, and IN) then clamp around the source
to be measured. An arrow on the current clamp indicates the direction of the load.
IA IB IC IN
Summary of Contents for PQ2000
Page 2: ......
Page 3: ...MPQ2000 PQ Analyzer...
Page 8: ...M MPQ2000 UG EN Rev 8 October 2018 2 M...
Page 10: ...M MPQ2000 UG EN Rev 8 October 2018 4 M...
Page 18: ...M MPQ2000 UG EN Rev 8 October 2018 12 M...
Page 22: ...MPQ2000 UG EN Rev 8 October 2018 16 M...
Page 27: ...MPQ2000 Operation MPQ2000 UG EN Rev 8 October 2018 21 Menu Flow Charts DMM Screen...
Page 28: ...M MPQ2000 UG EN Rev 8 October 2018 22 DMM Mode...
Page 48: ...M MPQ2000 UG EN Rev 8 October 2018 42 M...