MPQ2000-UG-EN Rev 8 October 2018
39
7
Installing the MPQ2000 PQ Analyzer
WARNING!
Be sure to use all appropriate safety equipment when installing
the MPQ2000 PQ Analyzer. Failure to do so can result in injury
or death.
WARNING!
Inspect all power cords and wires for proper insulation integrity
before connecting to any power source.
WARNING!
Exposure to excessive dust and submersing in water may result
in equipment damage
.
The installation procedure consists of:
1.
Charging the units battery prior to use.
2.
Ensure that the MPQ2000 PQ Analyzer is not exposed to water, excessive dust,
and other hazardous conditions. The MPQ2000 PQ Analyzer is not meant for
outdoor use.
3.
Making electrical connections.
Always complete all connections before beginning recording. Always stop
recording before removing connections.
Summary of Contents for PQ2000
Page 2: ......
Page 3: ...MPQ2000 PQ Analyzer...
Page 8: ...M MPQ2000 UG EN Rev 8 October 2018 2 M...
Page 10: ...M MPQ2000 UG EN Rev 8 October 2018 4 M...
Page 18: ...M MPQ2000 UG EN Rev 8 October 2018 12 M...
Page 22: ...MPQ2000 UG EN Rev 8 October 2018 16 M...
Page 27: ...MPQ2000 Operation MPQ2000 UG EN Rev 8 October 2018 21 Menu Flow Charts DMM Screen...
Page 28: ...M MPQ2000 UG EN Rev 8 October 2018 22 DMM Mode...
Page 48: ...M MPQ2000 UG EN Rev 8 October 2018 42 M...