Starting up for the first time
73
P221
60
60
60
P222
50
50
50
P223
20
20
20
P224
100
100
100
P225
100
100
100
P226
50
50
50
P228
122
122
122
P229
420
420
420
P230
32
32
32
P231
22
22
22
P260
0
0
0
no FRT or P170 = 0
P261
0
0
0
P262
0
0
0
P263
175
175
175
P265
15
25
36
P266
0
0
0
FRT - control P270 = 1
P267
20
20
20
FRT - control P270 = 1
P268
200
200
200
FRT - control P270 = 1
P269
20
20
20
FRT - control P270 = 1
P270
0
0
0
combustion chamber sensor
(FRT) is installed
P272
40
40
40
P218 larger 1 EH
P273
10
10
10
P218 larger 1 EH
P274
2
2
2
P218 larger 1 EH
P280
15
15
15
P281
140
140
140
P282
5
5
5
P283
9
9
9
P284
2
2
2
de-ashing system is installed
P285
175
250
100
vacuum-type system
P293
1
1
1
P294
0
0
0
auger system
PE 3671 USA 2.3
Installation Manual PES 36–56
Summary of Contents for Pellematic PES 12-20
Page 38: ...Connecting up to the power supply 38 Installation Manual PES 36 56 PE 3671 USA 2 3...
Page 46: ...Connecting up to the power supply 46 Installation Manual PES 36 56 PE 3671 USA 2 3...
Page 47: ...Connecting up to the power supply 47 PE 3671 USA 2 3 Installation Manual PES 36 56...
Page 88: ...Appendix 88 Installation Manual PES 36 56 PE 3671 USA 2 3...
Page 92: ...Appendix 92 Installation Manual PES 36 56 PE 3671 USA 2 3...
Page 99: ...Appendix 99 Labeling 105x74 PE 3671 USA 2 3 Installation Manual PES 36 56...
Page 100: ......