External de-ashing system
32
DE-ASHING PARAMETER
FACTORY SETTINGS
Parameter
Display on
screen
Description
PE(S) 12–20
PE(S) 25–32
PES 36–56
P195
Min running time
ash
Burner run time
until start of
next de-ashing
attempt
120 min
80 min
45 min
P196
Ash comp.
duration
Duration of
de-ashing
process
3 min
3 min
5 min
Note:
The de-ashing system compresses the ash and conveys it from the ash chamber into the ash box. How
frequently you need to empty the ash box depends on pellet consumption and the ash content of the pellets.
8.3 Installing the de-ashing system
MEco recommends installing the de-ashing system after the boiler has been brought in, but before the boiler casing is
fitted. The de-ashing system has to be installed before the burner casing is assembled.
Installation of the de-ashing system is divided into the following steps:
1.
Bringing in and installing the de–ashing system on the base plate
2.
Installing the de-ashing auger, fitting the sub-assembly and mounting the door plate
3.
Installing the burner side casing with cut-out and electrical connection
4.
Assembling the pellet boiler and activating the ash box
8.3.1 Bringing in and installing de-ashing system on the base plate
Installation Manual PES 36–56
PE 3671 USA 2.3
Summary of Contents for Pellematic PES 12-20
Page 38: ...Connecting up to the power supply 38 Installation Manual PES 36 56 PE 3671 USA 2 3...
Page 46: ...Connecting up to the power supply 46 Installation Manual PES 36 56 PE 3671 USA 2 3...
Page 47: ...Connecting up to the power supply 47 PE 3671 USA 2 3 Installation Manual PES 36 56...
Page 88: ...Appendix 88 Installation Manual PES 36 56 PE 3671 USA 2 3...
Page 92: ...Appendix 92 Installation Manual PES 36 56 PE 3671 USA 2 3...
Page 99: ...Appendix 99 Labeling 105x74 PE 3671 USA 2 3 Installation Manual PES 36 56...
Page 100: ......