10.2.2 Cable routing
Reroute cables after dismantling the casing or other system components.
Electric shock
Isolate the entire heating system from the power supply
before starting work on the pellet boiler.
Note the following points to ensure the cables are routed securely:
Cables must not be routed:
• over moving parts,
• over hot parts,
• or over sharp edges.
Cables must be:
• routed in the cable ducts provided and
• through cable leadthroughs,
• tied together,
• and secured with cable ties at the points provided.
• Power cables must be routed in the right-hand duct and sensor cables must be routed in the left-hand duct.
Electric shock
Check cables for damage.
Replace any cables that are damaged.
Damage to the boiler controller
Before fitting the casing components, make sure that the
cable plug connector codes match the socket codes.
Installation Manual PES 36–56
PE 3671 USA 2.3
Summary of Contents for Pellematic PES 12-20
Page 38: ...Connecting up to the power supply 38 Installation Manual PES 36 56 PE 3671 USA 2 3...
Page 46: ...Connecting up to the power supply 46 Installation Manual PES 36 56 PE 3671 USA 2 3...
Page 47: ...Connecting up to the power supply 47 PE 3671 USA 2 3 Installation Manual PES 36 56...
Page 88: ...Appendix 88 Installation Manual PES 36 56 PE 3671 USA 2 3...
Page 92: ...Appendix 92 Installation Manual PES 36 56 PE 3671 USA 2 3...
Page 99: ...Appendix 99 Labeling 105x74 PE 3671 USA 2 3 Installation Manual PES 36 56...
Page 100: ......