![McElroy Talon 2000 Operator'S Manual Download Page 67](http://html1.mh-extra.com/html/mcelroy/talon-2000/talon-2000_operators-manual_1754758067.webp)
Set Up Talon
3 - 11
Install Upper Jaw Inserts (continued)
Å
Start the fusion machine.
Å
Log in using the operator passcode.
Å
On the
Main Screen
, touch the
Machine Controls
button on the screen.
Å
Use the
Machine Elevation
button on the screen to raise the machine up.
Å
Close all four sets of jaws.
Å
Navigate to the Control Panel screen and touch the close application
button.
Å
Shut down the machine.
Å
Lift the quarter jaw using two people and place the jaw on the lower jaw pivot.
Rotate the quarter jaw down into place.
The quarter jaws and inserts are heavy. Using one
person to lift the jaws and inserts may result in an injury.
Two people are required to lift the jaws and inserts.
Ensure the quarter jaw is rotated all the way until the jaw stops against the
lower jaw pivot.
Å
Install the two bolts and washers to secure the quarter jaw to the lower
jaw pivot.
Å
Repeat these steps to install all other quarter jaws to the carriage.
¡PRECAUCIÓN!
ОСТОРОЖНО
ATTENTION
CD0
12
81-0
4-1
5-1
6
CD0
12
82-0
4-1
5-1
6
CD0
12
83-0
4-1
5-1
6
CD0
12
84-0
4-1
5-1
6