![Mazda SKYACTIV-G 2.5 Workshop Manual Download Page 79](http://html1.mh-extra.com/html/mazda/skyactiv-g-2-5/skyactiv-g-2-5_workshop-manual_1751978079.webp)
MECHANICAL
01-10–66
7. Tighten the camshaft cap installation bolts in two steps in the order shown in the figure.
Tightening torque
Step 1: 3.0—6.0 N·m {31—61 kgf·cm, 27—53 in·lbf}
Step 2: 8—11 N·m {82—112 kgf·cm, 71—97 in·lbf}
Electric Variable Valve Timing Actuator, Hydraulic Variable Valve Timing Actuator Assembly Note
1. Align the knock pin on the end of the camshaft
with the notch on the actuator (intake side) or
knock pin installation hole (exhaust side), then
install the actuator to the camshaft.
E2
E5
E4
E3
I2
I5
I4
I3
4
6
2
1
3
5
MARKED NUMBER
MARKED NUMBER
1
5
2
3
4
am3uuw00008996
INTAKE
CAMSHAFT
KNOCK PIN
NOTCH
ELECTRIC VARIABLE VALVE
TIMING ACTUATOR
EXHAUST
CAMSHAFT
HYDRAULIC VARIABLE VALVE
TIMING ACTUATOR
KNOCK PIN
INSTALLATION HOLE
KNOCK PIN
bpe2ue00000072
1A36-1U-12L.book 66 ページ 2012年12月10日 月曜日 午前9時25分