PAGE
DESCRIPTION OF CHANGE
COVER
Updated REV. and date of release.
10, 13, 18, 22,
23, 58
Mounting plates and platform opener changed.
22, 23
Updated platform adjustment procedure dimensions to be 1/2” to 2” maximum level
above bed height.
29, 35
Updated hydraulic schematics for GD. Removed optional PCFC.
30, 33, 36, 39
Added 12 V or 24 V battery to electrical schematics.
31
Added Off Time Delay Module to power down power unit and Table 35-1.
33, 39
Added Off Time Delay Module to power down electrical schematics.
37
Added Off Time Delay Module to power down power unit with MAX ECU Module
and Table 37-1.
42, 48, 49, 52
Updated 12 VDC full battery voltage to 12.6 volts.
42, 46, 47, 48,
49, 52, 54
Added 24 VDC values to troubleshooting procedures.
54, 55, 57
Updated
fi
gures to show new lock valve design.
57
Added reconnect lock valve harness instruction.
SUMMARY OF CHANGES: M-20-11, REVISION A
Summary of Contents for MXT-25
Page 1: ...M 20 11 REV A DECEMBER 2020 2020 MAXON Lift Corp...
Page 2: ......
Page 7: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 61: ......