31
8.4 ecb rePlAceMent
1) Turn off power and disconnect the cord from the machine.
2) Remove the front disks as outlined in Section 8.1.
3) Remove the front shrouds as outlined in Section 8.2.
4) Unplug the ECB (under mast connection point) from the wire harness (Figures A & B).
5) Loosen the 11mm nut on the tension loop bolt (Figure C).
6) Remove the tension loop bolt from the ECB bracket. (Figure D).
7) Remove the 6 bolts holding the ECB to the frame & remove the belt once loosened (Figure E).
8) Remove the old ECB and install the new ECB from the user’s left side of the frame. (Figure F).
9) Install the 6 frame mounting bolts loosely & attach the belt. (Figure G).
10) Attach the tension loop bolt to the ECB bracket and tension the belt to 120 lbs using an 11mm nut (Figure H).
11) Tighten the 6 frame mounting bolts to 12 N-m torque.
12) Reconnect the ECB wires, reassemble the front disks and shrouds.
13) Test the Ascent Trainer as outlined in Section 8.20. .
cHAPter 8: PArt rePlAceMent gUide
figUre A
figUre b
figUre c
figUre d
Summary of Contents for A3x-01 Ascent Trainer
Page 1: ...A 3 x 0 1 A s c e n t T r a i n e r SER V ICE M A N U A l ...
Page 2: ......
Page 19: ...15 Chapter 7 TROUBLESHOOTING 7 1 Electrical Diagrams ...
Page 20: ...16 7 1 electrical diagrams Chapter 7 TROUBLESHOOTING Wiring Diagram Instructions ...
Page 21: ...17 Chapter 7 TROUBLESHOOTING 7 1 electrical diagrams P05 Console Cable P04 Pulse Sensor Wire ...
Page 22: ...18 7 1 electrical diagrams chapter 7 troubleshooting P02 Elevation Wire P14 ECB Load Wire ...
Page 52: ...48 Chapter 8 Part Replacement Guide 8 17 link arm replacement continued ...
Page 68: ...64 notes ...