headline bars
continuation tabs
notes
warnings
headline bars
continuation tabs
notes
warnings
headline bars
continuation tabs
notes
warnings
model no. 054-6841-4 | contact us 1-800-689-9928
22
SWITCH BOX OPERATION
(fig 17a-17c)
Two receptacles are located at the back of the switch
assembly. Use one for plugging in the router. The
other may be used to plug in a vacuum or a light (not
included). Two dust shields are designed to protect
the receptacles (fig 18).
1. Insert the safety key into the switch.
2. To turn the switch ON, pull the ON/OFF
switch up.
3. To turn the switch OFF, push the ON/OFF switch
down.
4. To lock switch in the OFF position, push the ON/OFF
switch down to turn the tool OFF, and then remove
the safety key from the switch.
fig 18
Dust Shield
fig 17a
Safety key
Insert the safety
switch
fig 17b
Turn the router ON
fig 17c
Turn the router OFF
WARNING!
• To ensure safety and reliability, when one receptacle is used for the router, the capacity of the other receptacle is limited to 5 A.
The total current drawn by the two devices must not exceed 15 A.
• Never leave the router unattended while it is running or before it comes to a complete stop.
FPO
OPERA
TING INSTRUCTIONS
Summary of Contents for 054-6841-4
Page 32: ......