4
5. Locate the tail piece kit that is packaged with the control valve.
The standard tail piece kit is 1
” copper with optional 1” PVC
or 1
” Shark Bite kits available as a special order. Each tail piece,
o’ring, split ring and nut is presassembled at the factory. Align a
tail piece assembly to the bypass valve threaded inlet and insert
until the nut can be tightened. Hand tighten the nut because
excessive tightening will damage the assembly.
REPEAT THE
PROCEDURE FOR THE OUTLET CONNECTION.
Service and Drain Piping:
1. Pipe water combination unit into the service lines .The inlet and
outlet connections of the control valve are
¾” or 1” copper, PVC,
or sharkbite, and are located on the back of the valve body. As
you face the timer the inlet is on the right and the outlet is on the
left. Always follow local plumbing codes when installing our
water treatment equipment.
2. If sweat fittings are used, be sure soldering is done in such a
manner as not to allow heat to reach the control valve or bypass.
(If Schedule 80 PVC is used make sure to follow the proper
primer and solvent instructions.)
3. The drain lin
e connection is 5/8” OD or ¾” npt and is located on
the top left of the valve as you face the timer. It is recommended
you install a ¾” union on the drain line for servicing if not using
5/8 OD. The drain line must be of adequate size to allow for full
regeneration flow.
DRAIN LINE
CONNECTION