46
User Manual
47
User Manual
4.3 Configuration Menus Overview
The energy generated by
the solar panels will be
used in the following order:
Feed the home loads;
Charge the battery and
then, feed into the grid.
When the sun is not
present, the load will be
supported by the battery to
enhance self-consumption.
If the power supply from
the batteries is not
sufficient, the grid will
support the load demand.
This mode is designed for
time-use mode.
The customer can set up
the desired
charging/discharging
time & power via the
inverter screen or APP.
Manually forces the
system to charge the
batteries from the grid.
Manually forces the
system to discharge to the
connected load.
The battery is only used as
a backup power supply
when the grid fails. As long
as the grid works, the
batteries won’t be used to
power the loads. The
battery is charged with the
power generated by the PV
system or from the grid.
Allows the user to change
the PV array configuration
(wiring changes would also
apply!). When parallel input
is set to be independent
mode, PV power will be
imbalanced.
Allows the user to stop the
system exporting to the
grid.
Or, if enabled, to set the
export power limit.
If Enable is selected, the
user will be prompted to
enter the power.
Menu
Level 1
Default
Selection
Comment
SET UP
Enter
Password
(Default
00000)
SYS
Setting
Work
Mode
Self
Consume
Disable
Disable
Disable
Enable
Enable
Enable
Menu
Level 2
Menu
Level 3
Menu
Level 4
Menu
Level 5
Menu
Level 6
Independent
Disable
Charge
from Grid
Enable
Disable
(default)
Peak
SHIFT
Time
Setting
Charge
DISCHG
BAT Priority
Independent
Parallel
CV
PV input
Zero
export
Set the export
power limit
(Range: 0 ~
rated power)
Power
Only applicable in Australia
and New Zealand at this
time.
Enables the Backup output
(the Load Switch needs to
be turned ON).
Allows control via RS485
(Scada system for
example).
This is the boot delay from
when power is applied to
the inverter.
This function is only
applicable to use via DRM
for remote control
(Australian and New
Zealand markets only).
Ground fault monitoring on
the AC grid connection.
Depth of discharge. This
should always be enabled.
Disabling will result in the
battery discharging to 0%.
This option allows the user
to install a secondary
means of generation. For
example, wind generator
or diesel generator.
CT option is used for
measuring the system
current.
Meter option is used for
measuring the system
current.
Allows the user to connect
an external inverter to the
system (either instead of
PV, or in-addition to PC -
Hybrid mode).
When enabled, the inverter
will continue to export
power via the BACKUP port
in the event grid
disconnection (power cut).
Menu
Level 1
Default
Selection
Comment
Disable
Enable
Menu
Level 2
Menu
Level 3
Menu
Level 4
Menu
Level 5
Menu
Level 6
Disable
DRM
Enable
EPS
Enable
Enable
Disable
Enable
Disable
30 Seconds
Disable
Remote
CTRL
Start
Delay
Enable
20…300 Seconds
Disable
CEI SPI
Ctrl
Disable
Enable
Enable
GFCICHK
ENB
Disable
Enable
Enable
DOD
Enable
Disable
Enable
Disable
Generator
Disable
Enable
CT or
METER
CT
CT
Meter
Disable
AC
Couple
Disable
Enable
Enable
ISLAND
Disable
Enable