44
User Manual
45
User Manual
Allows the user to
select Chinese,
English or Italian
language.
Allows the user to
set the time, date
and day.
This action must
be performed
when the inverter
is externally
connected to the
CT.
Before the CT
self-check, the
inverter needs to
be connected to
the power grid and
the battery. The
backup circuit
breaker and
normal load
breaker needs to
be disconnected.
The CT self-check
takes about 1 ~ 5
minutes.
Menu
Level 1
Default
Selection
Comment
Menu
Level 2
Menu
Level 3
Menu
Level 4
Menu
Level 5
Menu
Level 6
Menu
Level 7
Menu
Level 8
English
9. New Zealand
10. Greece
11. France
12. Bangkok
13. Thailand
14. South Africa
15. 50549
16. Brazil
17. 0126
18. Ireland
19. Israel
20. Poland
21. Chile
22. Local
23. 60Hz
1. Chinese
2. English
3. Italian
Set time, date and day
Cut off all load then comfirm
Chile_BT
Chile_HD
Chile_LD
Language
Date/
Time
CT self-
check
CT self-check steps:
Step 1
- Open the external CT wiring port, the arrow points to the direction of the power grid, put the
wire into the external CT card slot, and buckle the buckle.
Step 2
- Disconnect the backup loads and the normal loads.
Step 3
- Connect the battery pack and Grid.
Step 4
- Perform CT self-check via LCD.