4.4.5 Lubricate and grease
OPERATION
ORDINARY MAINTENANCE
EXTRAORDINARY MAINTENANCE
GENERAL LUBRICATION
weekly
Yearly c/o manufacturer or authorised
workshop
1) GREASE THE INTERNAL COUPLING BETWEEN
PINION AND GEAR (manual version)
Make use of lithium-based grease.
IMPORTANT!
CLEAN AND LUBRICATE THE VARIOUS PULLEYS LOCATED ON THE MACHINE, ALSO
CABLES, GROOVES AND SLOTS OF THE PULLEYS, BY APPLYING SVITOL® or WD-40
LUBRICATING OIL OR A SIMILAR PRODUCT.
4.4.6 Check the elastic strings with hooks or the automatic lateral hooks (only if installed)
20/30 hours after assembling the system, carry out the following operations.
OPERATION
ORDINARY MAINTENANCE
EXTRAORDINARY MAINTENANCE
CHECK ELASTIC STRINGS OR
AUTOMATIC LATERAL HOOKS
monthly
Yearly c/o manufacturer or authorised
workshop
Check the conservation status of the hooking
components. If necessary, provide for their
replacement.
4.4.7 Replace broken or damaged fastening hooks on the outer board wall (only if installed)
OPERATION
ORDINARY MAINTENANCE
EXTRAORDINARY MAINTENANCE
CHECK FASTENING HOOKS
monthly
Yearly c/o manufacturer or authorised workshop
•
Replace the hooks at the first sign of wear and tear.