17.
While maintaining control with the tag line, swing
extension into position on boom nose. The 7m (23 ft)
section will remain on the boom.
18.
Remove pins from holders and install pins (1,
Figure 4-25) on left side of boom nose and secure with
retainer clips. Lower pin (2) is shown in pin holder,
remove from holder and install on boom nose.
Relieving the Load on Bearing Points
NOTE:
The weight of the lattice extension can cause the
bearing points on the left side to be misaligned or
the pins to bind which makes it impossible to knock
them out.
When establishing or disconnecting the connections,
proceed as follows:
•
Lower the lattice extension until it is on the ground
(Figure 4-26, 1). If necessary, override the lifting limit
switch.
•
Continue to lower carefully until the connecting points
align or until the load has been removed from the pins.
1.
Connect RCL cables:
a.
Remove RCL cable end connector (1, Figure 4-27)
from extension and route through jib.
b.
Remove dummy plug (1, Figure 4-28) from junction
box on boom nose.
c.
Install cable end connector (1, Figure 4-29) from jib
where dummy plug was removed.
2.
Lower boom and remove tag line (1, Figure 4-30)
from
the tip of the extension. Figure 4-30 shows the 7 m (23
ft) and 10.1 m (33 ft) section together.
6642-18
FIGURE 4-25
1
2
FIGURE 4-26
1
6642-44
6642-19
FIGURE 4-27
1
6642-20
FIGURE 4-28
1
6642-21
FIGURE 4-29
1
Reference Only