![Manitowoc Grove TMS800E13 Operator'S Manual Download Page 126](http://html.mh-extra.com/html/manitowoc/grove-tms800e13/grove-tms800e13_operators-manual_701232126.webp)
SET-UP AND INSTALLATION
TMS800E13 OPERATOR MANUAL
16
Published 02-06-2014, Control # 495-00
12.
Remove the clip pin (1, Figure 4-22) from the stowage
pin (2) at the front mount. Unpin the stowage pin (2) and
store in holder (3).
13.
Extend the boom approximately 60.9 cm (2 feet) to
move extension (1, Figure 4-23) off of the ramp (2).
NOTE:
If the boom is not extended or extended more than
approximately 60.9 cm (2 ft) the stinger will hit the
jib hanger.
14.
Remove tag line from superstructure.
NOTE:
Tag line is used to control movement of the jib
during erecting procedure.
NOTE:
If erecting the 7 m (23 ft) section with the 10.1 m
(33 ft) section, perform steps 18 and 19. If erecting
the 10.1 m (33 ft) section without the 7 m (23 ft)
section, proceed to step 17.
15.
Using the tag line (rope), pull the extension away from
the boom (Figure 4-24).
16.
While maintaining control of the extension with the tag
line, swing extension into position on boom nose
(Figure 4-24).
NOTE:
Step 17 is with the 7m (23 ft) section stowed on
boom.
2
FIGURE 4-21
6642-13
1
FIGURE 4-22
3
2
1
6642-46
WARNING
To prevent serious injury or death, do not stand on the
crane deck to pull extension off ramp.
6642-47
FIGURE 4-23
1
2
6645-3
FIGURE 4-24
7m (23 ft) section with the
10.1 m (33 ft) section
Reference Only