–25–
Step 6.
The suction line, liquid line and receiver
service valves are closed during shipment and
installation.
Open the valves prior to starting the ice machine.
A. Slowly backseat (open – turn counterclockwise) the
suction line shut-off valve.
B. Slowly backseat (open – turn counterclockwise) the
liquid line shut-off valve.
C. Slowly backseat (open-turn counterclockwise) the
receiver service valve.
SV1762
USE ALLEN WRENCH TO OPEN
(TURN COUNTERCLOCKWISE)
LIQUID AND SUCTION LINE
SHUT-OFF VALVES.
Q0600C/Q0800C/Q1000C
SV1769c
USE ALLEN WRENCH
TO OPEN (TURN
COUNTERCLOCKWISE)
LIQUID AND SUCTION
LINE SHUT-OFF
VALVES.
Q1400C/QDUAL
SUCTION AND LIQUID LINE
SHUT-OFF VALVES
Summary of Contents for CVD0675
Page 2: ......
Page 75: ... 69 QDUAL DISTRIBUTION TUBE SV1780 EVAPORATOR WATER PUMP WATER CURTAIN WATER TROUGH ...
Page 153: ... 149 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 203: ......