MD-TJ42
Operation and Maintenance Manual
MD02-OMM-70-001
Issue: 05
Rev. 00
Rev. Date: 19.11.2018
Page 7-6
(7)
Tighten screw connection on the nozzle
(8)
Screw mounting clamp for EGT-sensor to the engine
(9)
Connect EGT-sensor wiring to the sensor board
according to subsection 6.2.1
(10)
Connect battery
(11)
Perform engine ground test run according to section
4.3
(12)
Check EGT indication
7.5.3
RPM-Sensor
(1)
Disconnect battery
(2)
Disconnect RPM-sensor wiring from sensor board
(3)
Loosen grub screw
(4)
Pull out the RPM-sensor
(5)
Trim and strip the wiring of the new RPM-sensor
according to the wiring of the old RPM-sensor
(6)
Insert the new RPM-sensor into the retainer and adjust
the distance between the compressor wheel and the
sensor to 0.30 mm with a feeler gauge
(7)
Tighten the grub screw and recheck the distance
(8)
Connect the RPM-sensor wiring to the sensor board
according to subsection 6.2.1
(9)
Connect battery
(10)
Perform engine ground test run according to section
4.3
(11)
Check RPM indication
7.5.4
Sensor Board
If the sensor board has to be replaced, the operating time and
the cycles of the engine, which are stored on the sensor board,
must be read out and noted, for example via the JDU, before
replacement.