MD-TJ42
Operation and Maintenance Manual
MD02-OMM-70-001
Issue: 05
Rev. 00
Rev. Date: 19.11.2018
Page 7-4
12
Perform
engine
ground run
Check that the starter accelerates the
engine appropriately
Check EGT indication
Check RPM indication
Check fuel flow indication
7.4 Time Between Overhaul (TBO)
The operating times according to cycles, hours and years
(whichever occurs first) listed in the table below must not be
exceeded.
If one of the operating time limits is reached the applicable part
/ assembly has to be sent to M&D or a by M&D authorized
maintenance organisation for overhaul / inspection.
Part /
Assembly
Time Between Overhaul
Inspection
Time
Cycles
Hours
Years
MD-TJ42
449
50
6
ECU
-
-
6
Summary of Contents for MD-TJ Series
Page 1: ...Operation and Maintenance Manual MD TJ42 ...
Page 2: ......