INSTALLATION CONNECTION SCHEMA
GAS HEATING AND HOT WATER SYSTEM INSTALLATION CONNECTIONS
•
At DHW function, please make sure that the pressure of the city water network
on cold water inlet side is not more than 6 Bars. If the network pressure is more
than 6 Bars, a pressure regulator must be added.In order for the DHW system to
run, the minimum pressure level of the network must be 0,8 Bar.
•
At heating function. in order to provide a good circulation, installation pipes must
be selected accordingly and diameter structure must not be allowed at elbow
passage. When selecting the pipe diameter, pipe resistance above the capacity
of the pump must be abstained by the use of pump on heating system pressure
curve.
•
When there is a pressure increase at heating system, the security ventile
operates in order to discharge the overt pressure.
•
When radiator thermostatic valves are installed in the heating system and when
the heat balance is provided at all isolated departments, if the thermostatic
valves turns off the system: Automatic by-pass system immediately runs in order
to provide the minimum circulation in heat exchanger .
•
Gas installation connection must be done by gas tightness pastes and never
should there be a use of flax or teflon. The gas inlet pressure mentioned in this
book must be strictly obeyed.
Filling valve
Cold water
inlet 1/2"
Return water
inlet 3/4"
DHW outlet 1/2"
Heating water
outlet 1/2"
Gas connection
10