background image

ELECTRICITY CONNECTION SCHEMA

17

Summary of Contents for Epsilon LCD

Page 1: ...TS EN ISO 9001 2015 BOILER Please Keep Please Read rev no 01 12 04 2019 USER S GUIDE...

Page 2: ...EM FIRST OPERATING USAGE OF THE BOILER TECHNICAL SPECIFICATIONS ELECTRICITY CONNECTION SCHEMA HYDROLIC SCHEMA SAFETY SYSTEMS OF BOILER GAS PRESSURE SETTING MAINTENANCE GUARANTEE CONDITIONS IMPORTANT S...

Page 3: ...d open wires Do not leave tools or staff on the device Injury resulted from falling objects from device becuse of vibration Harms on things or animals resulted from falling objects from device because...

Page 4: ...re is lower boiler must be isolated within a proper keeping staff Only autorised service can intervene the all parts and sections that leakage is provided Disconnect the main energy connection shut do...

Page 5: ...n maintenance chapter Only Maktek Autorised services can intervene the boiler EXPLANATIONS Boiler provides the heating by central boiler heating system and radiators connected to the sytem and provide...

Page 6: ...APPERANCE AND EXTERNAL DIMENSIONS 4...

Page 7: ...BURNING ROOM 8 BURNER 9 3 BAR SAFETY VENTILE 10 CIRCULATOR 11 FILLING VALVE 12 GAS VALVE 13 HOT WATER SYSTEM SENSOR 14 CHIMNEY OUT 15 FRESH AIR IN FLANGE 16 HERMETIC CABIN SIDE STEEL 17 BURNING ELECT...

Page 8: ...ed temprature blinkes on the screen DHW function is OFF The boiler does not produce DHW TEST Mode of adjustment by AUTORISED SERVICE 2 P2 KEY OFF RESET The boiler is functionally switched off At failu...

Page 9: ...ODE SOLUTION E04 page 20 E01 page 20 E02 page 20 E03 E37 E05 page 21 E06 E12 E035 EXPLANATION Low or high water pressure No Flame Limit termostat Chimney thermostat Pump Failure Heating system sensor...

Page 10: ...roperly Please make the phase neutral and ground line connection as shown on the scheme IMPORTANT The boiler does not operate when the connection is done improperly The cable of the boiler must be con...

Page 11: ...no air circulation Wall mounted boiler must be installed vertically on a firm wall The unit must not be installed in connection with dirty and oily flue where the kitchen appliances are connected to...

Page 12: ...the capacity of the pump must be abstained by the use of pump on heating system pressure curve When there is a pressure increase at heating system the security ventile operates in order to discharge...

Page 13: ...ing water into the boiler Chimney shouldn t touch with flammable material shouln t get throught flammable wall material Part of the chimney which stays inside the wall must be maximum 60 cm in behind...

Page 14: ...the pugors other one can control the pressure by standing over the boiler and close the filling valve it is needed It is necessary to add water by opening filling valve in closed circuit system after...

Page 15: ...the circulation pump in case of squeezing Turn on all the valves on boiler and installation pipes Closed circuit water pressure must ne 1 5 bar page 13 Choose the position of use with the help of P1 a...

Page 16: ...mode boiler is shut down In OFF mode automatic protecting functions below are in use DHW Freezing Protection Central System Freezing Protection Pump Squeezing Protection 3 Way Valve Squeezing Protect...

Page 17: ...set to intended value by turning P1 key Temperature increases in clockwise decreases in counter clock wise Adjusted temperature is blinked on screen while adjusting When it is at adjusted degree adjus...

Page 18: ...TECNICAL SPECIFICATION TABLE 16...

Page 19: ...ELECTRICITY CONNECTION SCHEMA 17...

Page 20: ...heat sensor 5 Expansion tank 6 Burner 7 Three Way Valve Engine 8 Central heating circuit heat sensor 9 Hot water sensor 10 Pressure gauge 11 Gas valve 12 DHW exchanger 13 Filling valve 14 Circulation...

Page 21: ...iler will work again If this failure occurs two times consequently please call an authorised service 4 ANTI CALCER SYSTEM This system provides an indirect control against calcer formation Whatever the...

Page 22: ...can only done by an authorised service Diameter of the injectors must be suitable for fuel type used Natural Gas injector diameter 1 25mm LPG Propan Injector diameter 0 75mm Attention Be sure about th...

Page 23: ...sage energy saving and protect quality at the beginning Maintenance must be done by only MAKTEK Autorised Service Intervention of private services except autorised services is extremely dangerous and...

Page 24: ...s that belong the boilers which are damaged during transportation 6 Damages that occur as a result of bad dirty fuel use the use of over calcerous water in hot water system ideal water hardness must b...

Page 25: ...e appropriate fire extinguisher must be used When Performing Maintainance or Repair When working on the heating system or the boiler itself there should be no current on these The main switch or fuse...

Page 26: ...leave south west southwest and southeast position curtains open that are receiveing direct sunlight at winter time Temperature shouldn t be increased more than adequate in winter time When the tempera...

Page 27: ...ler can be use with LPG Boilers that Natural gas LPG Modification was done by MAKTEK Autorised Services or produced suitable for LPG burning must be run with minimum 2 tubes by building suitable colle...

Page 28: ...Seller 10013 Street No 14 A O S B i li IZMIR TURKEY Customer care sales maktek com tr Customer Hot Line 902323280365 www maktek com tr...

Reviews: