background image

P 11/ 11

 

 

 

Fig. 4 

Brush holder complete 

Heat sink 

Shadowed area 

Switch 

Terminal 

LED circuit 

Put Line filter (if used) in this space. 

Line filter 

if used

 

Put Line filter (if used) to the left side of Rib F. 

Put the sag of Lead wires of LED circuit 
in this space.

Do not put the sag of lead wire that is 
connected to Earth terminal (if used) 
on Shadowed area and Boss A.

Line filter 

if used

 

Put Heat sink as drawn. 

The projection of Earth terminal (if used) must be faced to the opposite side of Yoke unit or Yoke unit side. 

Fig. 3 

Put lead wire that is connected to Earth 
terminal (if used) in this lead holder. 

Boss A 

Earth terminal

Projection 
of Earth terminal 

Yoke unit 

OK

opposite side of Yoke 

unit

 

Projection of Earth terminal 

Projection of Earth terminal 

OK 

Yoke unit side

 

NOK sample 

Projection of Earth terminal 

Rib F 

Yoke unit 

Yoke unit 

Non-insulated terminals protected 
by Polyolefin tube 

(when repairing LED circuit) 

Put Non-insulated terminals protected 
by Polyolefin tube (when repairing 
LED circuit) inside dotted line. 

Makita Corporation

 

Summary of Contents for DHP482

Page 1: ...eed Yes Yes 1 5 3 4 1 1 8 3 9 2 13 1 2 38 1 1 2 21 stage drill mode Clutch torque setting N m in lbs 1 0 5 0 9 44 54 480 36 320 62 550 0 1 900 0 600 1 5 1 16 13 1 2 Max output W 400 LED job light 1 Wi...

Page 2: ...h Impactdriver Fix shorter legofHex wrench 10 in the jaws ofDrillchuck Note Stableoperation isavailableifyou tighten claws ofDrillchuck with a Round bitin advance 1 1 bit Impactdriver Hexwrench10 4 In...

Page 3: ...Headedpin1 2 x2 Changelever Tappingscrew 3x30 x4 Steelball5 x6 Carrier Spurgear10 x5 Internalgear38 Spurgear17D Speed changecam Washer 29 Spurgear18 x4 Internalgear49 Spurgear16 39E Spurgear11D x5 Int...

Page 4: ...efixedsecurely 5 PullSwitch triggerslowly with Drill mode Speed change1 Forward clockwise rotation untilSpindle is locked Note PullTrigger so thatSpindle s rotating reaches full speed inone second 6 A...

Page 5: ...hift the tailofTorsion springand hookitto thenotchofBrush holder Note Hold A to avoidTorsion spring slippingoff 7 Liftup Carbonbrush A Torsion spring Carbonbrush Brushholdercomplete Armature Yokeunit...

Page 6: ...ete 2 9 ProjectionofHousingL 6 Assemble Speed changelever toGear ass y Refer to 3 2 7 Fit theprojectionofHousing Linto the notchofYokeunit Notchof Yokeunit 2 7 Notchof Yokeunit Gear 1 Besureto assembl...

Page 7: ...surethatthe side surfaceofBrush holdercompleteisfitted in theinsideof Housing L s rib BesurethattheribofHousingLis fittedinthegrooveofChangering 2 10 8 PutTorsionspringback into the spaceto hold Carbo...

Page 8: ...theleverofSpeed changeleverintoCompression spring4whilepushingSpeed changeleverass yinthedirection ofthisarrow 4 ShiftSpeedchangeleverintheeitherdirection Pinontheleverof Speed changelever Projectiono...

Page 9: ...ete Line filter ifused Flag receptaclewith lock 250 t 0 8 Straight receptacle with lock 187 t 0 8 Flag receptaclewith lock 250 t 0 8 Flag receptaclew o lock 187 t 0 8 Line filter ifused Blue 22AWG Ear...

Page 10: ...ead holderA Flag receptacles have to be connected so that their wire connecting portions arelocated over the marks of poles LED circuit RibA Rib B Put lead wires ofLED circuitbetween RibAand Rib B The...

Page 11: ...jection ofEarth terminal ifused must be faced to theopposite sideofYoke unit orYoke unit side Fig 3 Put lead wire that is connected to Earth terminal ifused in this lead holder BossA Earth terminal Pr...

Reviews: