WINDROWER OPERATION
Form 169552 / 169554 / 169555
68
Revision A
m. Attach tow-bar to windrower.
The M105 transport drawbar provides
approximately 12 in. (300 mm) of fore-aft
movement to ease the attachment of a towed
implement.
1. Back the windrower up to the tow-bar (A) so
that drawbar hole (B) is within 6 in.
(150 mm) of the tow-bar clevis pin.
2. Stop engine, and remove key.
3. If the tow-bar (A) is
too far
from the drawbar
(B):
i. Remove pin (C), lift the drawbar support
(D) until the tow-bar clevis aligns, and
then install the drawbar pin (E).
ii. Start engine, and gently reverse the
windrower until the drawbar support
pivots down into “transport position”.
iii. Stop engine, and remove key.
iv. Re-install pin (C) to secure drawbar
support, and proceed to step n. (on next
page).
IMPORTANT
Ensure lynch pins are secure in all three
pins, and that the drawbar pin is also
secured by a locking pin.
4. If the tow-bar (A) is
too close
to the
windrower:
i. Remove pin (F), lower the drawbar
support (D) until the tow-bar clevis aligns,
and then install the drawbar pin (E).
ii. Start engine, and gently drive the
windrower forward until the drawbar
support pivots up into “transport
position”.
iii. Stop engine, and remove key.
iv. Re-install pin (F).
(continued next page)
OR
0 to 6 in. (150 mm)
0 to 6 in. (150 mm)
B
A
C
D
B
A
E
F
D
A
E