UNLOADING AND ASSEMBLY
169078
18
Revision E
STEP 13. ATTACH HEADER TO
WINDROWER
a. Remove pins (A) from left and right header
boots (B).
IMPORTANT
To prevent damage to the lift system when
lowering header lift linkages without a
header or weight box attached to
windrower, ensure that float engagement
pin is installed in storage location (C), and
not installed at hole location (D).
CAUTION
Check to be sure all bystanders have cleared
the area.
b. Start windrower engine, and activate HEADER
DOWN button on the GSL to fully retract header
lift cylinders.
IMPORTANT
If the center-link is too low, it may contact
the header as the windrower approaches
the header for hook-up.
c. If necessary, adjust position of the hydraulic
center-link (E) so that the hook (F) is above the
attachment pin on the header by using one of
the following methods:
1. If the optional center-link self-alignment kit is
installed, activate the REEL UP switch on
the GSL to raise the center-link (E).
(continued next page)
B
A
HEADER UP
HEADER TILT UP
HEADER
TILT DOWN
REEL UP
REEL DOWN
HEADER DOWN
D
C
E
F
Summary of Contents for A30-S
Page 55: ...NOTES 169078 53 Revision E ...