Lucent Technologies -48V CPS4000/CPS4000 PLUS Cabinet Power System
5 - 6 Installation and Testing
Issue 13 December 2000
Installing Shelves and Batteries, continued
Interconnecting
Initial and
Supplemental
Shelves, continued
Interconnecting initial and supplemental shelves to form one plant
requires power connections between TB1, TB2, and TB3 on the initial
shelf and between TB1 and TB2 on the supplemental shelves.
Refer to Figure 5-2.
Note
You may order cables and associated hardware for
interconnecting two or three shelves with lists K2 and K3,
respectively.
Interconnecting Initial and Supplemental Shelves
Step
Action
1
Connect TB-3 on the initial shelf to TB-2 on the supplemental
shelf.
2
Connect TB-1 on the initial shelf to TB-1 on the supplemental
shelf.
3
Connect batteries, if provided, between TB-1 and TB-2 on the
initial shelf. (See “Installing Batteries” procedure.)
4
Connect the loads between TB-1 and TB-2 on the
supplemental shelf.
5
Connect an intershelf cable from J7 on the left of the initial
shelf to J7 on the left of the supplemental shelf.