
Chapter 3 Installation and Test Operation
3-7
3.3 Sequence from installation to operation
The sequence of the product from installation to operation will be described below. After the product installation is complete,
install and configure the system to be operated as specified in the following sequence.
3.3.1 RAPIEnet I/F Module for PLC
Remark
1) Station number of REPIEnet I/F module is necessary to set due to hardware properties.
: If the station No. is same with other RAPIEnet I/F Module on the
network, conflict will occur.
Execute high speed link parameter
downloading and link enable.
Execute high speed link communication
Begin
Check the functions and specification to
be used.
Install module on the base.
→ Check base/slot position.
Connect module and device with cable,
set module station No.
Turn power on. Check module LED
state. (RUN: green)
Connect XG-PD and XGK/XGI CPU with
cable.
Read IO information at XG-PD
→ After
“Read IO Information,” the module
appears on themain setting window
Set up P2P parameters (channel, P2P function,
start-up condition, data size/area/type,
corresponding Stn No.)
Execute P2P communication.
Comm.
Method
Execute parameter downloading and link
enable
Set up high speed link parameters.
(comm. module, comm. cycle, emergency
output data, mode, station No., block No.,
data size/area)
Summary of Contents for XBL-EIMT
Page 153: ...Appendix A 17 A 3 Dimension Unit mm XGL EIMT EIMF EIMH ...
Page 154: ...Appendix A 18 XOL EIMT EIMF ...
Page 155: ...Appendix A 19 XBL EIMT ...