4 - 15
④
Handling of the 3-point linkage
z
When driving without attached implement;
1. Fix upper link(5) with the fixing hook.
2. Connect stabilizer(2) to the lower link(3) to avoid the lateral movement of the lower link.
3. Connect lower link spring to lower link(3). (if fitted).
z
When attaching another implement using hitch or drawbar, raise 3-point linkage to maximum height
and fix it by turning the down speed control knob to lock position.
z
When removing 3-point linkage, if necessary;
1. Remove upper link pin(7), and detach the upper link(5).
2. Detach rear side of the stabilizer(2) from the lower link(3) while holding lower link tightly not to fall
down.
3. Remove lift rod (LH), lift rod (RH) and stabilizer(2) step by step.
4. Remove lower link(3) carefully not to get hurt due to its weight.
1. Lift rod (LH)
2. Stabilizer
3. Lower link
4. Lift rod (RH)
5. Upper link
6. Lift rod pin
7. Upper link pin
①
④
③
⑤
②
⑥
⑦