4 - 21
Lift rod(LH)
Lift rod(RH)
480~530 mm(CAT1)
(18.9 ~ 20.9in)(CAT1)
450~ 565 mm(CAT1)
(17.7 ~ 22.2in)(CAT1)
467~533 mm(CAT2)
(18.4 ~ 21.0in)(CAT2)
472~ 572 mm(CAT2)
(18.6 ~ 22.5in)(CAT2)
①
Upper link installation and
adjustment
Select a suitable attaching hole(2) depending on
the draft load of the implement. The upper hole
is more sensible than lower one for draft load
control. (optional)
Adjust the length of the upper link with turning
the sleeve(4) after loosening locking nut(3).
Fasten the locking nut(3).
Adjustment range :
CAT1 : 430~654mm (16.9~25.7 in)
CAT2 : 484~734mm (19.1~28.9 in)
▶
Insert snap-pin(6) firmly to prevent the upper link pin(5) from being escaped.
Notice
②
Adjustment of lift-rod (Left/Right)
For lift rod (LH), remove the lift-rod pin(3) and
detach the upper side from the lift arm and turn
the upper side(1) left/right to adjust the length.
For lift rod (RH), lift up the handle(5) and turn it
to the left or right to adjust the length. Lock the
lift rod handle(5) to the lower part after adjusting.
Adjustment range :
⑥
④
②
⑤
③
Upper link
⑤
④
①
②
▶
Do not adjust the length of the upper link over the maximum limit. It may cause
fatal injury or death by falling object.
Caution
▶
Do not adjust the length of the lift-rod over the maximum limit. It may cause fatal
injury or death by falling object.
Caution
③
Summary of Contents for MT342
Page 1: ...LS TRACTOR OPERATOR S MANUAL MT342 MT347 MT352 MT357 Stage...
Page 2: ......
Page 46: ...1 32 2 9 6 11 3 1 Roll Bar 5 10 7 8 4 12 13 14 16 18 17 10...
Page 62: ...1 48...
Page 76: ...2 14...
Page 180: ...4 42...
Page 248: ...5 68...
Page 258: ...7 2 Unit mm Roll bar type Front tires 9 5 16 6PR Rear tires 13 6 24 8PR...
Page 263: ......
Page 264: ...P NO 52132436 05 DATE 20220000...