20
Grain Bag Loader OM
Set-up Instructions
Initial Set-up (Cont’d)
Main Auger Installation (Cont’d)
1
1
2
2
3
Install the two connector strap assemblies over the
tunnel frame (1) and hitch frame (2) (both sides) .
Install the remaining two connector straps (3) . Install flat
washers and nuts on the four bolts .
Tighten the four bolts/nuts evenly . As the bolts/nuts are
tightened, the connector straps will pull the two frames
together . Continue to tighten the four bolts/nuts until the
two frames contact each other and no gap remains .
1
2
3
Install one flat washer onto the 3/4" x 3" Grade 5 bolt .
Install 3/4" x 3" Grade 5 bolt w/washer (1) through
the base assembly and main auger assembly upper
mounting plates . Install one flat washer (2) and nut (3)
(both sides) and tighten nut .
1
2
Remove retaining pin (1), rotate the jack (2) to the
operation position and re-install retaining pin . Raise/
lower the jack until the main auger assembly is level .
Remove the forklift from the hitch .
1
Install the second retaining ring/clamp (1) around the
main auger and sleeve . Tighten the retaining ring/clamp .
Summary of Contents for GrainLogix GBL12A
Page 2: ......
Page 4: ......
Page 10: ...2 Grain Bag Loader OM...
Page 22: ...14 Grain Bag Loader OM...
Page 76: ...68 Grain Bag Loader OM Maintenance...
Page 77: ...69 Grain Bag Loader OM Parts Identification PARTS IDENTIFICATION AND SCHEMATICS...
Page 99: ...91 Grain Bag Loader OM This page intentionally left blank Parts Identification...
Page 142: ...134 Grain Bag Loader OM...
Page 147: ...139 Grain Bag Loader OM Appendix Torque Specifications Inches Hardware and Lock Nuts...
Page 148: ...140 Grain Bag Loader OM Appendix Torque Specifications Cont d Metric Hardware and Lock Nuts...
Page 149: ......