31
Grain Bag Loader OM
Set-up Instructions
Initial Set-up (Cont’d)
Main Hopper Assembly (Cont’d)
1
2
3
Place one hopper extension side panel (1) outside the
hopper extension front and back panels (2) .
Install 1/2" x 1-1/4" bolts (3) and secure with 1/2" nuts
(both sides) .
1
Install these three 1/2" x 1-1/4" bolts and secure with
1/2" nuts (1) .
NOTE:
Do not tighten bolts and nuts at this time.
Repeat the previous procedure for the remaining hopper
extension side panel on the opposite end of the hopper .
Tighten all bolts and nuts to securely fasten the hopper
extension panels to the hopper .
Main Hopper Installation
1
1
2
Install chains (1) at the two lift points (2) on the hopper
cross braces .
Raise the hopper slowly, then move the hopper over the
mounting frame .
Align and lower the hopper onto the mounting frame .
Summary of Contents for GrainLogix GBL12A
Page 2: ......
Page 4: ......
Page 10: ...2 Grain Bag Loader OM...
Page 22: ...14 Grain Bag Loader OM...
Page 76: ...68 Grain Bag Loader OM Maintenance...
Page 77: ...69 Grain Bag Loader OM Parts Identification PARTS IDENTIFICATION AND SCHEMATICS...
Page 99: ...91 Grain Bag Loader OM This page intentionally left blank Parts Identification...
Page 142: ...134 Grain Bag Loader OM...
Page 147: ...139 Grain Bag Loader OM Appendix Torque Specifications Inches Hardware and Lock Nuts...
Page 148: ...140 Grain Bag Loader OM Appendix Torque Specifications Cont d Metric Hardware and Lock Nuts...
Page 149: ......