![Load Cell Systems WDESK-L Installation And User Manual Download Page 55](http://html1.mh-extra.com/html/load-cell-systems/wdesk-l/wdesk-l_installation-and-user-manual_1932344055.webp)
- 50 -
RESUME BATCHING AFTER A POWER CUT
If a blackout occurs during the batching (unloading phase included), when power comes back
appears: press ENTER to resume batching from the point of interruption, press ESC to
cancel the batching and return to the weight displaying.
If in constants
=
, when power comes back
appears and after 3
seconds the batching is automatically resumed.
Power failures do not cause any deletion of cycles still to be performed.
CONSUMPTION
If in constants consumption is enabled (
=
), the quantities batched for each product are
stored.
Selecting
the following information is displayed:
-
total quantity consumed for all products (divided by 100);
-
deletion data;
-
quantity consumed for each product.
The quantities will be printed out in full.
CONSUMPTION DELETION
To delete consumption confirm
, the
deletion confirmation is requested; confirm again
with ENTER or press ESC to cancel the command.
If the printer is enabled (see section SERIAL COMMUNICATION SETTING) an operation receipt is
printed.
…
Summary of Contents for WDESK-L
Page 27: ...22 BATCHING CONSTANTS it appears only if in constants TOTAL YES...
Page 66: ......
Page 67: ......