Owner’s Manual
Hydraulic pump 609-29232-1 Single-line with 165-l container
4.1EN-68607-G09
Subject to changes
Page 13 of 15
LINCOLN GmbH Postfach 1263 D-69183 Walldorf Tel +49 (6227) 33-0 Fax +49 (6227) 33-259
Piston Unit
•
Slip mounting sleeve onto the piston unit
pos. 60
.
•
First push the O-ring
pos. 220
over the mounting sleeve into the groove and then the Glyd ring
pos. 210
. Heat the Glyd
ring in oil, water or by means of a hot air ventilator up to a temperature
of 80°C – 100°C in order to facilitate installation.
•
Calibrate the mounted sealing with the calibrating sleeve.
•
Insert guide rings
pos. 200
into the groove.
The mounting and calibrating sleeve is available as special accessory.
Cylinder
•
Lightly oil piston unit pos. 60 and the thread of the cylinder tube pos. 10.
•
Carefully stick together components without using force.
•
Screw together cylinder head pos. 20 and cylinder tube pos. 10 until they stop and firmly tighten with wrench SW 27
(lightly beat with hammer)
•
Adjust the front-side marking of the piston rod (punch mark) to the reference axis. (see view X)
Piston rod/connecting block – tube
•
Mount O-rings pos. 480 (2 pieces), then push the connecting block pos. 440 ontothe piston rod
•
Tighten cylinder screws pos. 460 only after the tube has been pushed into the guiding bushing pos. 430. The flange bores
are larger than the screw diameter, this means clearance compensation is possible.
Sealing Installation
Calibration
Installation Tools