TruScan 532 Single - Wavelength – Operators Manual Rev. No 02
Page 80 of 114
5.5 Final Verification / Checkout
When the system is now fully setup, the final verification is required to conduct before
demo or handle over to the user end. These performance procedures can be divided as
follows:
Slit lamp Integrity Rechecks
System Initialization Rechecks
Pre-check / Alignment LDU
When the Laser Delivery unit has been fitted to the Slit lamp the alignment of the Laser
beam with reference to the Slit lamp needs to be checked and adjusted accordingly. The
following procedures will guide you through the entire pre-check and alignment process.
Three different types of LDU systems are detailed as follows:
Slit lamp (Integrated)
LIO (Optional)
Endoprobe (Optional)
A.
Integrated Slit lamp LDU
Prior to pre-check and realign the integrated Slit lamp LDU, ensure all the corrected
installation or setup are in placed (including personal’s dioptre setting, fiber connection,
and console setup and on) prior to proceed the following steps.
Slit Integrity Checkou
t
1.
Insert the Slit lamp target rod into the Slit lamp or set up a target to view the
Illumination spot
2.
Set a narrow slit width with low intensity illumination and verify that the slit is
focused if not, follow through the below steps:
A. Set the target rod up and ensure the objective and target rod are
perpendicular