![LG V-NET PQCPC22A0 Installation & User Manual Download Page 36](http://html.mh-extra.com/html/lg/v-net-pqcpc22a0/v-net-pqcpc22a0_installation-and-user-manual_209511036.webp)
3
6
Ope
r
atin
g
ACP with ACCS
ENGLISH
2
Current operation status and power control setting (graph type)
Current operation status is displayed in the left side of
the peak operation control screen, and there is a graph
that can set power control function. To change the peak
operation ratio, you can drag mark with mouse to set
the desired operation ratio.
3
Power control setting
On the right side of the peak operation control screen, there is a setting category that can set
the desired power consumption with the units of percentage (%).
When it exceeds the value set here, the air conditioner is operated in peak operation function
periodically according to the peak operation rule.
Target Operating Rate: sets the desired power consumption to operate peak operation func-
tion in the units of percentage (%). (It can be set in the range of
0~100% of the maximum possible power consumption, and it can be
adjusted in the units of 1 %.)
Cycle: sets the peak operation period (It can be set in the range of 5~15 min., and it can be
adjusted in the units of 1 min.)
CAUTION
Peak setting
• Set the peak during peak operation state or run the peak operation after setting the peak.
• If peak operation is not run after setting the peak, the actual peak operation ratio will not be
set.
!