Installation Manual
15
Installation Space
Installation
Foundation for Installation
[Unit:mm]Z
Z
Foundation bolt executing method
200
Nut
75
75
200
Spring washer
Frame
Anti-vibrationZ
materials
Four bolt are Z
requiredZ
3 thread ridgesZ
Z
H-Beam
ConcreteZ
base
100
• Check the strength and level of the installation ground so that the unit will not cause any operating vibration or
noise after installation.
• Fix the unit securely by means of the foundation bolts. (Prepare 4sets of M12 foundation bolts, nuts and
washers each which are available on the market.)
• It is best to screw in the foundation bolts until their length are 20mm from the foundation surface.
Summary of Contents for ARUN50LH2A
Page 66: ......