3
Electrical
68
PA1
2020-05-12
S023074
Pin
Number
Description
Wire Colour
Wire Size mm
2
Rating (Amps)
5
Power supply ignition
Red
0.35
5
6
Load space illumination Blue / Green
1.5
15
7
Chassis CAN High
Brown / White
0.35
8
Chassis CAN Low
Brown / Green
0.35
9
ECM signal
(Geofencing)
Yellow
0.35
10
11
12
Ground battery saver
supply
Black / Orange
2.5
13
Ground ignition
extended supply
Black / Orange
1.5
14
Ground permanent
supply
Black / Orange
0.35
15
Ground load space
supply
Black / Orange
1.5
16
Ground ignition supply
Black / Orange
0.35
Ground Connections
Do not attach additional ground terminals on the vehicles factory installed ground connections.
If it is necessary to install a new ground point:
1. Select a location on the aluminium structure for a new ground point.
– Do not install ground points in wet areas.
– Do not attach ground connections to doors. The hinges and rails do not give a good path
to ground.
– Do not install ground connections near the fuel tank or fuel pipes.
– Do not attach more than two terminals to each new ground connection.
– Examine the Drill Zones,
, to make sure there is no risk of damage to other
components before you drill.
– Do not drill into structural adhesive or close to bonded sections of the aluminium
structure.
2. Check the alumium extrusion or panel is grounded. Find and riv-nut in the same extrusion or
panel, and test the resistance from this riv-nut to the 12V battery ground connection. The
resistance between the riv-nut and the battery ground connection must be less than 0.003
ohms. Use a 30A low resistance tester, low current digital multimeter's are not suitable for
this test.
3. Drill the correct size hole and install a riv-nut or riv-stud. Obey the manufacturers instructions
for the riv-nut/stud and the equipment used.