Figure 103. Assembling a PHM in the shipping tray
a. Align the triangular marks on the processor retainer and the heat sink or align the triangular mark on
the processor retainer with the notched corner of the heat sink.
b. Insert the processor-retainer clips into the holes on the heat sink.
c. Press the retainer into place until the clips at all four corners engage.
.
Hardware replacement procedures
107
Summary of Contents for ThinkSystem SR850
Page 1: ...ThinkSystem SR850 Maintenance Manual Machine Type 7X18 and 7X19 ...
Page 8: ...vi ThinkSystem SR850 Maintenance Manual ...
Page 58: ...50 ThinkSystem SR850 Maintenance Manual ...
Page 142: ...134 ThinkSystem SR850 Maintenance Manual ...
Page 166: ...158 ThinkSystem SR850 Maintenance Manual ...
Page 170: ...162 ThinkSystem SR850 Maintenance Manual ...
Page 174: ...Taiwan BSMI RoHS declaration 166 ThinkSystem SR850 Maintenance Manual ...
Page 176: ...168 ThinkSystem SR850 Maintenance Manual ...
Page 182: ...174 ThinkSystem SR850 Maintenance Manual ...
Page 183: ......
Page 184: ...Part Number SP47A24295 Printed in China 1P P N SP47A24295 1PSP47A24295 ...