Figure 117. Power interposer installation
Step 3. Align the two pairs of nailheads of the system board air baffle to slots, and lower it into the server.
Attention:
Air baffle is required for airflow that creates proper cooling. Make sure proper air baffle
(s) for system configuration is installed before the power is turned on.
Figure 118. System board air baffle installation
After installing the system board air baffle, complete the following steps:
1. Reinstall the top cover (see “Install the top cover” on page 131).
2. Reconnect the power cords and any cables that you removed.
3. Install the server in the rack.
4. Power on the server and any peripheral devices.
.
Hardware replacement procedures
119
Summary of Contents for ThinkSystem SR850
Page 1: ...ThinkSystem SR850 Maintenance Manual Machine Type 7X18 and 7X19 ...
Page 8: ...vi ThinkSystem SR850 Maintenance Manual ...
Page 58: ...50 ThinkSystem SR850 Maintenance Manual ...
Page 142: ...134 ThinkSystem SR850 Maintenance Manual ...
Page 166: ...158 ThinkSystem SR850 Maintenance Manual ...
Page 170: ...162 ThinkSystem SR850 Maintenance Manual ...
Page 174: ...Taiwan BSMI RoHS declaration 166 ThinkSystem SR850 Maintenance Manual ...
Page 176: ...168 ThinkSystem SR850 Maintenance Manual ...
Page 182: ...174 ThinkSystem SR850 Maintenance Manual ...
Page 183: ......
Page 184: ...Part Number SP47A24295 Printed in China 1P P N SP47A24295 1PSP47A24295 ...