26
NE10032 Installation Guide
System Status LEDs
The following table describes the behavior of the system status LEDs:
Notes:
Support for the stacking feature depends on the installed firmware. To
determine whether your switch supports stacking, see the
Application Guide
for
your specific switch and firmware version.
If service required is due to a stacking error, this LED flashes or is steady green,
depending on its last known good state.
Table 5.
System status LEDs behavior
LED
State
Functional Meaning
All
Off
Total power failure.
- Service
Steady Blue
An operational command has been sent to light the
LED so that this device can be more readily located.
Flashing Blue
Service is required due to failure of the general system,
its cooling fans, stacking function
1
or its power supply.
The specific failure is indicated in conjunction with the
other system status LEDs.
- Power
Steady Green
Power supply is on and operational.
Flashing Green
Power supply failure or disconnection. Service is
required.
Off
Power supply shutdown. Service is required.
- Fans (1 -6)
Steady Green
Fans are on and operational.
Flashing Green
Fan failure. Service is required.
Off
Fan shutdown. Service is required.
- Stacking
1
Steady Green
Device is a Master in a stack.
2
Flashing Green
Device is the Backup/Member in a stack.
2
Off
Device is not a stacking member.
Summary of Contents for ThinkSystem NE10032
Page 6: ...6 Lenovo NE10032 Installation Guide ...
Page 16: ...16 NE10032 Installation Guide ...
Page 58: ...58 NE10032 Installation Guide ...
Page 76: ...76 NE10032 Installation Guide ...
Page 92: ...92 NE10032 Installation Guide ...
Page 108: ...108 NE10032 Installation Guide ...
Page 114: ...114 NE10032 Installation Guide ...