NOTE: DIAGRAMS AND ILLUSTRATIONS ARE REPRESENTATIVE AND ARE NOT DRAWN TO SCALE.
33
INTERIOR WALL fINISh
A minimum 1" (25 mm) clearance is required
from the door frame outer edge to any finish
material.
Note: NEVER install combustible
material (wall finish, surround, trim,
etc.) on, in front of, or overlapping any
part of the appliance front face.
See Page 4 for Cold Climate Insulation
and Page 6 for Clearances.
Wall finish Requirements
for Cleanface finish
(without optional Surround)
1.
TOP/BOTTOM NAILINg fLANgES:
Make
sure TOP and BOTTOM Nailing Flanges
are attached to fireplace in the correct
VERTICAL position for
Cleanface finish
and the correct HORIZONTAL position for
the wall finish material thickness (
Page 9
).
2.
LEfT/RIghT SIDE NAILINg fLANgES:
Make sure the LEFT and RIGHT SIDE Nailing
Flanges are
installed
(see
Figure 33-2
).
Note:
Fireplace ships from factory with
the all nailing flanges installed.
3.
LEfT/RIghT fILLER/ANgLE BRACkETS:
Make sure the two Filler/Angle Brackets are
installed
(ref.
Figure 34-2, next page
).
Note:
Fireplace ships from factory with
both Filler/Angle Brackets installed.
4.
NON-COMBUSTIBLE fIBER BOARD:
See
Figures 33-1, this page, and 34-1,next
page.
Attach the provided non-combustible
fiber board to the TOP Nailing Flange, and
secure using field-supplied screws.
Note: The provided non-combust ible
fiber board may be faced with any
NON-combustible finish material ap-
propriate for use (brick, tile, stone,
high-temperature paint*, etc.).
5.
INTERIOR WALL fINISh:
Cover the lower
portion of the fireplace with finish material.
6. Skim-coat all drywall, and mud all joints.
Note: If skimming the provided fiber
Board to match drywall, use Sheet-
rock
®
brand Durabond
®
90 setting-
type joint compound to fill all joints.
*for painted wall finish, use two (2)
coats of quality primer and high-tem-
perature paint on provided fiber Board.
7.
DOOR:
After finishing all interior walls,
install the Glass Door Assembly, if not
already done (see
Page 29
).
____________
The following trademarks are owned by United States Gyp-
sum Company or a related company: Durabond, Sheetrock.
LENNOX HEARTH PRODUCTS • ELITE LINEAR VIEW DIRECT-VENT GAS FIREPLACE (MODELS LDV42, LDV54) • INSTALLATION INSTRUCTIONS
Wall finish Requirements when
Installing Optional Surround
1.
TOP/BOTTOM NAILINg fLANgES:
Make
sure TOP and BOTTOM Nailing Flanges are
attached to fireplace in the correct VERTI-
CAL position for
Surround finish
and the
correct HORIZONTAL position for the wall
finish material thickness (see
Page 9
).
2.
LEfT/RIghT SIDE NAILINg fLANgES:
REMOVE the LEFT and RIGHT SIDE Nail-
ing Flanges (see
Figure 33-2
), and discard
using appropriate disposal methods.
3.
LEfT/RIghT fILLER/ANgLE BRACkETS:
REMOVE the two Filler/Angle Brackets (see
Figure 33-2
), and discard using appropriate
disposal methods.
4.
NON-COMBUSTIBLE fIBER BOARD:
See
Figures 33-2 (this page) and 34-1 (next
page).
Attach the provided non-combus-
tible fiber board to the TOP nailing flange,
and secure using field-supplied screws.
fINISh
AND TRIM
Note: The provided Non-Combust ible
fiber Board may be faced with any
NON-combustible finish material ap-
propriate for use (brick, tile, stone,
high-temperature paint*, etc.).
5.
INTERIOR WALL fINISh:
Cover the lower
portion of the fireplace with finish material.
6. Skim-coat all drywall, and mud all joints.
Note: If skimming the provided fiber
Board to match drywall, use Sheet-
rock
®
brand Durabond
®
90 setting-
type joint compound to fill all joints.
*for painted wall finish, use two (2)
coats of quality primer and high-tem-
perature paint on provided fiber Board.
7.
DOOR:
After finishing interior walls, install
the Glass Door Assembly, if not already
done (
Page 29
).
8.
SURROUND:
Attach the Surround, and
secure using the nine (9) screws provided
with the Surround Kit (see
Figure 34-3
).
Figure 33-2: Preparing for optional Surround finish
Non-combustible
Fiber Board
(secured
to TOP Nailing Flange)
Cleanface Finish
1. Secure Non-Combustible Fiber Board to TOP Nailing Flange using field-provided screws.
2. Make sure Left and Right SIDE Nailing Flanges are installed.
3. Make sure Left and Right Filler (Angle) Brackets are installed.
Figure 33-1: Preparing for cleanface finish
Before installing optional Surround, remove both filler/angle brackets and both side nailing flanges.
Left Side
Nailing
Flange
(removed)
Left Side Filler/Angle Bracket
(removed)
Non-Combustible Fiber Board
Cut to height of installed top spacers.
Top Nailing
Flange
Right Side
Nailing
Flange
Top Nailing
Flange
Before installing optional Surround, remove both filler/angle brackets and both side nailing flanges.
Left Side
Nailing
Flange
(removed)
Left Side Filler/Angle Bracket
(removed)
Non-Combustible Fiber Board
Cut to height of installed top spacers.
Top Nailing
Flange
Right Side
Nailing
Flange
Top Nailing
Flange