CHAPTER 2
Installation, Planning, and Mounting
The following is a basic outline for installing and setting up your M3000 system. Some steps may
have been done for you depending on what you ordered. Some steps are optional, depending on the
additional equipment you plan to use. These steps are noted.
• WARNING! •
Do not apply power to any component until the installation is complete.
Damage to components may occur if power is incorrectly applied.
1.
Determine the cable clamps needed and obtain them before starting the installation.
During the installation, remember to:
•
Label all connections/cables for ease of maintenance.
•
Leave enough slack in the wiring so the cables can be “dressed”. This minimizes
interference during board removal or replacement.
2.
Unpack your system. Refer to
.
3.
Mount the enclosure. Refer to
4.
Connect AC power to the power supply. Refer to
Connecting the AC Input Power to the M3000
5.
Mount and install the battery backup. Refer to
Installing the Battery Backup, AC Fail, and Low
6.
Wire up the Power/Communications board. Be sure to configure and verify the switch settings.
Refer to
7.
If using networked controllers, verify that your network is up and running.
8.
Install and wire up the PXNplus CPU board. Be sure to configure and verify the jumpers. If this
is a network controller, plug in the network cable. Refer to
.
9.
Install the reader board(s) into the enclosure and wire up the readers to the controller. Be sure to
configure and verify the switch settings, jumpers, and/or resistor packs. Refer to
10.
If using digital inputs (DIs), insert the DI board into the enclosure and wire the DIs to the board.
Be sure to configure and verify the switch settings. Refer to
11.
If using digital outputs (DOs), insert the DO board into the enclosure and wire the DOs to the
board. Be sure to configure and verify the switch settings. Refer to
.
12.
Test the wiring before you apply power. Refer to
Summary of Contents for m3000
Page 1: ...7 3 M3000 Installation Guide...
Page 4: ......
Page 14: ...Introduction 14 M3000 Installation Guide...
Page 30: ...Power Communications Board 30 M3000 Installation Guide...
Page 32: ...PXNplus CPU Board 32 M3000 Installation Guide PXNplus CPU Board Layout...
Page 38: ...Reader Processing Boards 38 M3000 Installation Guide 2RP Board Layout 2RP Board Layout...
Page 50: ...Reader Processing Boards 50 M3000 Installation Guide 2SRP Board Layout 2SRP Board Layout...
Page 55: ...M3000 Installation Guide 55 2SRP Board 2SRP Supervised Reader Connector Points...
Page 61: ...M3000 Installation Guide 61 2SRP Board Wiring 2SRP Door Strike Internal Relay...
Page 65: ...M3000 Installation Guide 65 8RP Board Board Layout 8RP Board Layout...
Page 70: ...Reader Processing Boards 70 M3000 Installation Guide...
Page 72: ...Optional DI and DO Boards 72 M3000 Installation Guide 20DI Board Layout 20DI Board Layout...
Page 75: ...M3000 Installation Guide 75 16DO and 16DOR Boards 16DO Board Layout...
Page 76: ...Optional DI and DO Boards 76 M3000 Installation Guide 16DOR Board Layout...
Page 80: ...Pre Power Up Testing 80 M3000 Installation Guide...
Page 99: ...M3000 Installation Guide 99 CE Regulatory Notice CE Regulatory Notice...
Page 100: ...Regulatory Information 100 M3000 Installation Guide...
Page 110: ...110 M3000 Installation Guide...
Page 114: ...114 M3000 Installation Guide Resistances Detected by PXNplus...
Page 117: ...M3000 Installation Guide 117 Index...