
M3000 Installation Guide
71
CHAPTER 6
Optional DI and DO Boards
The M3000 controller supports the following DI and DO boards:
•
20 Digital Input (20DI) board (page 71)
•
16 Digital Output (16DO) board (page 74),
•
16 Digital Output with Relays (16DOR) board (page 74).
Although the M3000 enclosure holds up to five (5) option boards, the specific number of DI and DO
boards supported by the different host software systems varies. OnGuard supports a maximum of 4
DI or 4 DO/DOR boards.
20DI Board
The 20DI board provides 20 supervised digital input (alarm) points. Supervised DIs have end-of-line
resistors on the contacts which enable the controller to detect line shorts and breaks in addition to the
open and closed contact conditions.
Please note the following:
•
The maximum distance allowed between the M3000 and the alarm input device is 1,000 feet
(304.8 m).
•
The recommended cable wire is a two-conductor, 22-AWG shielded, stranded cable.
Summary of Contents for m3000
Page 1: ...7 3 M3000 Installation Guide...
Page 4: ......
Page 14: ...Introduction 14 M3000 Installation Guide...
Page 30: ...Power Communications Board 30 M3000 Installation Guide...
Page 32: ...PXNplus CPU Board 32 M3000 Installation Guide PXNplus CPU Board Layout...
Page 38: ...Reader Processing Boards 38 M3000 Installation Guide 2RP Board Layout 2RP Board Layout...
Page 50: ...Reader Processing Boards 50 M3000 Installation Guide 2SRP Board Layout 2SRP Board Layout...
Page 55: ...M3000 Installation Guide 55 2SRP Board 2SRP Supervised Reader Connector Points...
Page 61: ...M3000 Installation Guide 61 2SRP Board Wiring 2SRP Door Strike Internal Relay...
Page 65: ...M3000 Installation Guide 65 8RP Board Board Layout 8RP Board Layout...
Page 70: ...Reader Processing Boards 70 M3000 Installation Guide...
Page 72: ...Optional DI and DO Boards 72 M3000 Installation Guide 20DI Board Layout 20DI Board Layout...
Page 75: ...M3000 Installation Guide 75 16DO and 16DOR Boards 16DO Board Layout...
Page 76: ...Optional DI and DO Boards 76 M3000 Installation Guide 16DOR Board Layout...
Page 80: ...Pre Power Up Testing 80 M3000 Installation Guide...
Page 99: ...M3000 Installation Guide 99 CE Regulatory Notice CE Regulatory Notice...
Page 100: ...Regulatory Information 100 M3000 Installation Guide...
Page 110: ...110 M3000 Installation Guide...
Page 114: ...114 M3000 Installation Guide Resistances Detected by PXNplus...
Page 117: ...M3000 Installation Guide 117 Index...